Construction of the LK&O Railroad

An open forum to discuss all aspects of modeling the Akron Canton & Youngstown Railroad.
User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Mon Nov 12, 2012 9:46 pm

A&M Hardware 12"x18" bracket template 1:1 scale on 24" deep bench.

Image

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Sun Dec 16, 2012 1:20 am

Benchwork has begun! Built the first of many sections today. On vacation over the holidays so should be able to make great progress. Using framing angles for attachment instead of the usual end grain screw or pocket screws. This will allow me to reposition cross members from below if changes are needed later on due to track change, the need to locate an actuator, etc. I am positioning the cross members so they don't interfere with switch machines and linkages hence the track plan on the floor. The doubled up cross members are where the wall brackets attach. This particular section is the west end yard throat of Brittain. Details: http://www.lkorailroad.com/benchwork-co ... thodology/
100_5054.jpg
100_5054.jpg (180.46 KiB) Viewed 4479 times
100_5057.jpg
100_5057.jpg (173.88 KiB) Viewed 4479 times

User avatar
Peacock
Site Admin
Posts: 36
Joined: Sat May 19, 2012 5:55 pm
Location: Akron, Ohio
Contact:

Re: Construction of the LK&O Railroad

Post by Peacock » Mon Dec 17, 2012 7:49 pm

Looks ike it's going to be a clean installation! Looking forward to seeing your progress. :mrgreen:

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Fri Dec 21, 2012 12:22 am

Moving right along
100_5064acy.jpg
100_5064acy.jpg (72.79 KiB) Viewed 4472 times
100_5065acy.jpg
100_5065acy.jpg (79.21 KiB) Viewed 4472 times
100_5069acy.jpg
100_5069acy.jpg (77.68 KiB) Viewed 4472 times

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Mon Dec 31, 2012 9:55 pm

More progress... benchwork in the River Styx area being built. The trestle will span the lowered bench section. More pics and details at: http://www.lkorailroad.com/benchwork-part-ii/

The benchwork around the basement walls (the easy to build part ;) ) is finished. I am now beginning the benchwork attached to the backdrop wall.
100_5200.jpg
100_5200.jpg (144.82 KiB) Viewed 4464 times
100_5296.jpg
100_5296.jpg (101.06 KiB) Viewed 4464 times
Hope everyone had a Merry Christmas and wishing you a Happy New Year.

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Wed Jan 23, 2013 1:45 pm

Want some more benchwork progress pics?

Image

Image

User avatar
Luke
Forum Moderator
Posts: 102
Joined: Sun May 20, 2012 9:00 pm

Re: Construction of the LK&O Railroad

Post by Luke » Thu Jan 24, 2013 10:02 pm

Alan, Have been following your LK&O postings.... you're making GREAT progress! Very nice work! Bob

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Sun Feb 24, 2013 12:15 am

Upper deck benchwork is finished. Lower deck lighting is next on the list.

http://www.lkorailroad.com/upper-benchwork-finished/

Video trip around the upper deck https://www.youtube.com/watch?v=OMUjDZJDT88

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Sun Mar 10, 2013 10:03 pm

Lower deck lighting progress. 72 more lamps and reflectors.

Image

Image

User avatar
LKandO
Posts: 37
Joined: Tue May 22, 2012 9:06 am
Location: Michigan
Contact:

Re: Construction of the LK&O Railroad

Post by LKandO » Sun Jun 02, 2013 7:54 pm

Finished the layout lighting. You have to use your imagination that there is a lower deck in place. Am going to get the upper deck functional before building the lower deck. Upper deck sub-roadbed is next on the agenda. There are many more photos at: http://www.lkorailroad.com/lighting-com ... -finished/

Image

Post Reply